Assembly and Welding
Our Shop is staffed and equipped to handle almost any sized unit. Our certified welders relish the challenge new products bring. Stainless, Aluminum, Carbon Steel, Hastelloy or whatever your material requirements are, our crew is ready and poised to meet your needs. Many orders are shipped within four to six weeks.
Our welders are AWS D1.1 certified in carbon steel and stainless steel. We have in place a quality control system, which meets the high standards of the power industry. This quality control system is used in our manufacturing process for all our customers, to provide all with same high standards. Our ability to work with stainless steel, carbon steel and aluminum demonstrates our shop's flexibility to manufacture a varied mix of products.
Northern Metal Fab, Inc. is ready, we're capable, and we will deliver the service and quality your products require. Give our representative a call with your next challenge.

